Skip to content
Home page
Selected Projects
News
Tenders and auctions
Job opportunities
About us
Ariana at a glance
History
Management
governance
Certificates and awards
CSR
Innovation
Contact us
X
En
En
Fa
Ru
Ar
Projects
Home page
»
Projects
»
Page 2
Project type
Internal
External
Project status
Ongoing projects
Completed projects
Filters
Remove filters
Search
وضعیت پروژه ها
Ongoing projects
(18)
Completed projects
(29)
نوع پروژه ها
Internal
(22)
External
(25)
دسته پروژه ها
Geotechnical Engineering
(2)
Water Transmission
(5)
Irrigation
(12)
Pollution Control
(1)
Tunnel
(2)
Hydropower Plants
(1)
Mining Infrastructure
(1)
Metro and Railway
(1)
Buildings
(8)
Pavement Repair
(0)
Dam Construction
(3)
Flood Protection System
(1)
Roads, Bridges and Highways
(14)
نمایش فیلترها
پاک کردن فیلترها
فیلترکن
Construction of Shagun-Zighar Road in the Republic of Tajikistan (Phase 2) & (Phase 3)
Construction of second band of Khomein-Aligudarz Highway
“Construction of Rahim abad-kolachay Road axis in the vicinity of Barajin road(KM 4+500 to KM 9+000)”
Construction of Kameh water transfer tunnel and its hydraulic structures under EPC condition
Execution of construction works for the Asalem to Khalkhal Tunnel (Almas Pass)
Construction works of the Dushanbe–Qurghonteppa railway line, Vahdat–Yovon section in the Republic of Tajikistan
Rehabilitation of 180 km of railways in the northern region, Tehran, Isfahan, east, south, Yazd, and northeast (1)
Strengthening of railway bridges of the old Eslamshahr-Garqom axial railroad second segment (Parandak-Garqom) to increase load bearing capacity using non industrial EPC method
Strengthening of railway bridges on the Bafgh-Bandar Abbas axial railroad (second segment) (Ghare tappe-Enshe’ab, Enshe’ab-Bandar Abbas, Enshe’ab-Shahid Rajaei) in order to increase load bearing capacity using non-industrial EPC method
Construction of first floor underpass of Gohardasht Karaj
Engineering, Procurement of materials, and construction (EPC) of the project of opening the north road axis of Valiasr Boulevard in Mehrshahr with Tehran- Tabriz railway and its completion (Phase 1 & 2)
Construction of Kaj Interchange
No items found.
1
2
3
4