Skip to content
Home page
Selected Projects
News
Tenders and auctions
Job opportunities
About us
Ariana at a glance
History
Management
governance
Certificates and awards
CSR
Innovation
Contact us
X
En
En
Fa
Ru
Ar
Ongoing projects
Home page
»
وضعیت های پروژه
»
Ongoing projects
Project type
External
Internal
Project status
Completed projects
Ongoing projects
Filters
Remove filters
Search
وضعیت پروژه ها
Completed projects
(31)
Ongoing projects
(19)
نوع پروژه ها
External
(26)
Internal
(23)
دسته پروژه ها
Flood Protection System
(1)
Roads, Bridges and Highways
(14)
Geotechnical Engineering
(2)
Water Transmission
(5)
Irrigation
(12)
Pollution Control
(1)
Tunnel
(3)
Hydropower Plants
(2)
Mining Infrastructure
(1)
Metro and Railway
(1)
Buildings
(8)
Pavement Repair
(0)
Dam Construction
(3)
نمایش فیلترها
پاک کردن فیلترها
فیلترکن
Construction of Left Bank Structures in Rogun Dam and HPP (Lot 4)
Construction of Parts of Left Bank of Rogun Dam and HPP (Lot 4 Early Work)
Construction of 32 km road from Agarak to Vardanish and continuing to the existing tunnel (Section 4), Kajaran
Construction Of About 7 km Kajaran Tunnel And Reconstruction Of About 4 km Approaching Roads
Construction of petrochemical restaurant in Bandar Imam
Preparation, construction, transportation and implementation of precast concrete pile driving operations of chlor-alkali unit
Rehabilitation of 180 km of railways in the northern region, Tehran, Isfahan, east, south, Yazd, and northeast (1)
Strengthening of railway bridges of the old Eslamshahr-Garqom axial railroad second segment (Parandak-Garqom) to increase load bearing capacity using non industrial EPC method
Strengthening of railway bridges on the Bafgh-Bandar Abbas axial railroad (second segment) (Ghare tappe-Enshe’ab, Enshe’ab-Bandar Abbas, Enshe’ab-Shahid Rajaei) in order to increase load bearing capacity using non-industrial EPC method
Construction of Kaj Interchange
Construction of the ramp connecting fast lane to slow lane of Shora Blvd.
Improvement of Irrigation and Drainage Systems of Makhtaaral-1, Frist & Second Launch Area, Under Second Irrigation and Drainage Improvement Project
No items found.
1
2