Skip to content
Home page
Selected Projects
News
Tenders and auctions
Job opportunities
About us
Ariana at a glance
History
Management
governance
Certificates and awards
CSR
Innovation
Contact us
X
En
En
Fa
Ru
Ar
Completed projects
Home page
»
وضعیت های پروژه
»
Completed projects
Project type
Internal
External
Project status
Ongoing projects
Completed projects
Filters
Remove filters
Search
وضعیت پروژه ها
Ongoing projects
(19)
Completed projects
(28)
نوع پروژه ها
Internal
(22)
External
(25)
دسته پروژه ها
Pollution Control
(1)
Tunnel
(2)
Hydropower Plants
(1)
Mining Infrastructure
(1)
Metro and Railway
(1)
Buildings
(8)
Pavement Repair
(0)
Dam Construction
(3)
Flood Protection System
(1)
Roads, Bridges and Highways
(14)
Geotechnical Engineering
(2)
Water Transmission
(5)
Irrigation
(12)
نمایش فیلترها
پاک کردن فیلترها
فیلترکن
Construction of a section of the Rogun Dam Hydropower Plant in Tajikistan (3600 MW)
Construction of Ayni-Mast Chah Koohi road
Geotechnical operations at the Sangtuda-1 Hydropower Plant in the Republic of Tajikistan
Design and construction of Bagratashen Bridge on the border crossing between Armenia and Georgia
Construction of new landfill HRAZDAN (including buildings and structures)
Preparation, waste removal, extraction of mineral ore (gold and arsenic), construction and maintenance of access roads at the ZarShouran Gold Mine
Execution and safety implementation of the downstream flood discharge system, access road, and remaining works of the Narmashir (Nesa) Dam.
Construction of Shagun-Zighar Road in the Republic of Tajikistan (Phase 2) & (Phase 3)
Construction of second band of Khomein-Aligudarz Highway
“Construction of Rahim abad-kolachay Road axis in the vicinity of Barajin road(KM 4+500 to KM 9+000)”
Construction of Kameh water transfer tunnel and its hydraulic structures under EPC condition
Execution of construction works for the Asalem to Khalkhal Tunnel (Almas Pass)
No items found.
1
2
3